Hawken Project Blog #5

We are currently approaching the midpoint of our Hawken Project, and boy has it been a lot of work. David and I continue to work hard every day and accomplish a lot. The past couple of days have been some of our most productive of the entire project. Over the past couple of days David and I have managed to start building the kiosk, dig the holes in the pond, receive equipment, plan our fish stocking adventure, and design the kiosk signs. This past day, David and I started building the base of the kiosk. We have all of our materials, and the solar equipment has slowly started to come in. We have the entire main frame done and planned out the roof. The solar panels that go on the roof to power the aerator will face south to maximize east-west sun movement, especially in the winter when the sun will be slightly south. Attached below are pictures of our progress. 





During the past couple of days, Mr. Biggar was able to give us a lot more donated equipment. We have received a large collection of fly tying equipment that is all arranged in boxes. We placed all of this equipment into our fishing club room. Picture below.





 Most of the previous day I had spent a lot of time working on the actual sign that will go on our kiosk. After a lot of photoshop work we hope to place this onto the kiosk. The back of the kiosk will have the trail map. I drove out to fast signs and asked for a quote which they were able to give to us. We hope to put this order in soon. Pictures of the front and back of the kiosk are below. 





Comments

  1. I love all of the details in this post! Thanks for including the photos. You two have learned so much in this process about dealing with challenges and opportunities. It will be great to have a permanent memory of this process next to the pond.

    ReplyDelete